Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3M 5M 10M 20M for Medium Large Dogs Non-Slip

Durable Dog Tracking Leas

Beige / 3M
£17.99
Skip to product information
Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3M 5M 10M 20M for Medium Large Dogs Non-Slip

Durable Dog Tracking Leas

£17.99
Color
Size

Keep your dog safe, controlled, and happy during walks with the Durable Dog Tracking Leash. Made from high-quality nylon, this long lead provides strength, flexibility, and comfort for both pets and owners. Available in 3M lengths, it’s ideal for training, walking, and outdoor activities with medium to large dogs.

The non-slip handle ensures a secure grip, while the sturdy leash gives your dog freedom to explore safely.

Key Benefits

  • Long leash options for flexible dog movement
  • Durable nylon construction resists wear and tear
  • Non-slip handle for safe and comfortable control
  • Ideal for medium and large dogs
  • Perfect for walking, training, and outdoor adventures

YOU MAY ALSO LIEK